Tenant improvements
Coordinate revised walls, ceilings, lighting, diffusers, soffits, and other architectural or mechanical changes.
System modifications
Renovations, tenant improvements, additions, new ceilings, room changes, equipment, and revised storage can affect sprinkler layout and coverage.
Service overview
Existing-system work begins with understanding the current configuration and the proposed building change. The appropriate solution may require records review, field verification, design, calculations, permitting, material planning, or coordination with other trades.
Capstone evaluates the authorized scope without assuming that an existing layout remains appropriate after the space changes.
What the work may involve
Coordinate revised walls, ceilings, lighting, diffusers, soffits, and other architectural or mechanical changes.
Review sprinkler position, obstruction, spacing, access, branch-line conditions, and approved design requirements.
Consider the existing system, water supply, demand, routing, new areas, and required engineering or jurisdictional review.
A different occupancy, storage arrangement, or room function may require broader evaluation than a simple relocation.
The Capstone approach
Review the proposed renovation, drawings, existing records, schedule, and property operations.
Compare available documentation with accessible field conditions and identify missing information.
Develop the authorized solution and obtain required design, permit, or jurisdictional direction.
Perform the approved work, complete applicable testing, and update project records.
Talk through the property
Share the building type, project stage, known system information, and preferred meeting time. Capstone will review the request before confirming an appointment.